- A new product or a process is beginning (at the beginning of the cycle).
- The changes are made to the conditions of operation of the product or it hopes that the process works inside.
- A change is made to the product or design of the process. The product and the process are correlated. When the product design changes is affected the process and vice versa.
- The new regulations are instituted.
- The regeneration of client indicates problems in the product or the process
Thursday
Synchronization of FMEA
The FMEA is an alive document. Through development cycle of the product, change and the updates that become in the product and process. These changes often can and introduce new ways of failure. It is therefore important to review and/or to bring up to date the FMEA when:
Subscribe to:
Post Comments (Atom)
0 comments on "Synchronization of FMEA"
Post a Comment